So got the boat stuff just about all done, and the weather has been relentless. Howling winds and single digit temps. Changed gears and started on the BADLASS in earnest. Spent yesterday actually cleaning and painting the hood hinges. Just went with satin black to KISS. Mocking up the assembly (MU) I found an extra threaded hole on each fender by the hinge bolts. One book shows two bolts and another shows three; whats #4 for?
Siphoned about 8 gallons of gas outa the tank and removed that. Came out just like it was supposed to. Gas gage with a 1965 90 ohm sender works well, albeit "sloshy" on the dash end. May still replace with a correct unit for the 30 ohm 64 gage. Depends on finances LOL.
Started the demolition job in the trunk. Air chisel worked swell. Thats the tool of choice for cutting the junk out. ALL of the subframes were at least 95% intact. Every spot weld was an SOG to cut with the chisel. About 2 hours of fitness cutting/trimming will have the frames ready for cleaning and priming; probably tomorrow after blood lab at 0700hrs.
So now, I bought the whole BOP trunk floor kit, including replacement frames. If anyone plans on this job, the extras will be available for a screaming deal. Still wrapped like I received them. Thatll make it way easy for some one to buy just the floor tins and do the job.
Heres some stuff from today. ESPECIALLY the last one!
Also seriously considering the Power Tour this year from say, Champaign, Il to Madison, Wi. Anyone else up for it? Bill
https://youtu.be/h3jt3G6XLZshttps://youtu.be/c1YnnQswGgI